Job Openings
Topsides Transportation & Installation Lead (O-1567 Q) - 2
About the job Topsides Transportation & Installation Lead (O-1567 Q) - 2
Job Description Highlights:
- Lead installation contractor on all aspects of load-out, transportation and offshore installation of the NFXP Topside Modules to ensure all objectives are met and in compliance with the approved scope, budget, schedule, and EPC contract requirements and ensure that interfaces with Project PMT, Offshore Team and Contractor are managed effectively.
- Provide offshore execution subject matter expertise in the areas of module load-out, sea-fastening, marine operations, sea-transportation, and final offshore installation with heavy lift vessel.
- Provide competency and previous experience to advise and make recommendations as the project focal point regarding the following installation engineering/analyses; SPMT Load-out Ballast Plan/Stability Checks, Load-out Mooring Design/Analysis, Grillage and Sea fastening Design, Float-On/Off Operations, General Marine Operations, Sea-Transportation Analysis, Lift Analysis and Rigging Design.
- Engineering Degree (preferably Naval Architecture) or similar, other qualifications technical or knowledge requirements may be waived through relevant work experience in lieu of sufficient years in the field of Installation Management.
- Required to have valid offshore survival certificate and be able to pass an offshore medical evaluation.
- Minimum of 10 years of experience in discipline with at least 5 years demonstrated installation experience in similar major capital Topside module installation projects.
- Offshore experience with EPC contractors, sub-contractors and vendors involved in the oil and gas industry.
- Worldwide experience with contractors in particular those involved in the Offshore LNG production facilities.
- Working knowledge and application of stakeholder specifications and Industry standards.
- Good interpersonal and communication skills with a focus on teamwork and the ability to communicate and interact within a PMT.
- Module load-out, sea-fastening, marine operations, sea-transportation and heavy-lift offshore installation subject matter expertise and practical experience.
- Provide competency and previous experience to advise, make recommendations as the project focal point regarding the following installation engineering/analyses; Load-out Ballast Plan/Stability Checks, Load-out Mooring Analysis, Grillage and sea fastening Design, Float-On/Off Operations, Sea-Transportation Analysis, Rigging Arrangement, Lift Analysis.